Health Center

Significant Savings for Health Center

The health center “Medicum am KBO” was built in 2022 on the site of the Bremen-East Clinic in Germany. The rental space has now been transferred to the users. The approximately 4,900 m² of rentable space to be realized extends over 6 levels from the ground floor to the 5th floor. For this project, 3 tenants were attracted from the sector of post-hospital care / short-term care for adults and children. All three tenants have access to a cafeteria on the ground floor, which is operated by the main tenant, and to garden areas. In this project, the direct proximity of the Bremen-East Clinic has a favorable effect on the synergies for all involved, i.e., doctors and patients.

In this project, the enev-kit e5 30 was used. This provides the customer with a potential saving of 72,539 kWh per year + 14.58t CO2

Installed:

enev-kit e5 30

U – S T R A N G

Designation / project number: 169420 / 169520

  • Group of 2 1,000 kg/ 1,600 kg
  • 13 persons / 21 persons
  • 17925 main
  • 6/6 stops/accesses + 6/6
  • Door width: 900 mm / 1,200
  • Door height: 2100 mm /2,100

 

  • Shaft (W x D): 2,315×2.8 + 1.6×2.5m
  • Shaft height (SH): 22.625m
  • Minimum opening according to LBO: 0.16 + 0.10 m²
  • Installation variant: B-recessed
  • Scale opening H x W: 680 x 860 mm
  • Selected louver flap: 600 x 700 mm = 0.29 m²