How long does the installation take?

Our certified and trained partners can install an enev-kit in your elevator shaft within 3-8 hours.

This includes proper intake and work preparation. The enev-kit is tailored to the opening in the roof and we deliver it as a ready-to-plug-in complete construction kit with a bag of candy. No special tools are needed, and we even provide a special drill.

Our system can evacuate smoke from elevator shafts within the building envelope and contains fully approved components. NRWG (Natural Smoke and Heat Exhaust Ventilation System) according to DIN EN 12101-2 (for both roof and vertical wall installation). The smoke extraction system according to VDS and DIN EN 54-20. Our system is installation independent. The components and the entire system are CE certified.

enev-kit has its own European installation team and can fully relieve its clients of the burden.

Almost all specialized elevator companies are ready for sales, professional installation, and maintenance. We can train elevator companies.